It Looks Finnish With All the K's and N's and a U
Criminal Enterprise by Owen Laukkanen. The cover stinks. I usually ignore all cover jacket blurbs except this has one by Kirkus. Kirkus is stingy about giving good reviews but had this, "Fans of crime thrillers shouldn’t miss this one or anything else with
Laukkanen’s name on the cover. The writing is so crisp, the pages almost
want to turn themselves. He’s a terrific storyteller."
I Saw The Movie
The Looking Glass War by Jon Le Carre. 8 CDs at 9 hours. 1965 and a novice spy is sent into the Eastern Bloc to find missiles. The flick was released in 1969 and was pretty decent. I cannot recall if I watched the flick on video or TV. There is a scene in the film where the lackadaisical spy is being pushed by Anthony Hopkins's character to take things seriously. Hopkins starts a fistfight with the spy get the guy to defend himself and escape.
Three in One
Eclipse Bay Collection: Eclipse Bay, Dawn in Eclipse Bay, Summer in Eclipse Bay by Jayne Ann Krentz. 15 CDs at 18 hours. This will check out.
Fiction
Six Years by Harlan Coben. Looks like Harlan Coben made sure to shave his head the morning of his author photo.
Family Pictures by Jane Green. Stay on your digital camera forever and never seem to get uploaded.
You & I, Me & You by Mary Janice Davidson. I did not want to use those ampersands in the title but I did anyway. I am very adventurous.
L.D. Fargo Public Library in Lake Mills, WI 120 East Madison Street, Lake Mills, WI 53551 920.648.2166
Thursday, March 21, 2013
Photos
Renovation
Lights are being shifted
New door frame for door to conceal the bookdrop and tool supply area. The new door will have an etched glass window to let in light. I think. The door window will be something translucent.
Railings by front door were sanded down and glue applied for new tops.
New tops getting installed on railings.
Tops are on, joined, and sanded smooth.
The painters have continued down the stairwell and into the lower level.
Lights are being shifted
New door frame for door to conceal the bookdrop and tool supply area. The new door will have an etched glass window to let in light. I think. The door window will be something translucent.
Railings by front door were sanded down and glue applied for new tops.
New tops getting installed on railings.
Tops are on, joined, and sanded smooth.
The painters have continued down the stairwell and into the lower level.
Subscribe to:
Posts (Atom)